If you’ve ever worked on a roof or siding project with wood shingles, you know that even the highest-quality products won’t perform as they should without proper prep work. As a wood shingles supplier, I’ve seen too many projects derail because installers skip small, critical steps that prevent warping, cracking, and even premature rot. Today, I’m breaking down the exact prep process I walk every customer through, from uncrating the shingles to the final pre-installation checks—no shortcuts, just actionable steps that stand up to 10+ years of use. Wood Shingles

First, let’s start with the most overlooked step: handling your shingles immediately after delivery. When our shingles leave our warehouse, they’re kiln-dried to a 12-14% moisture content, the sweet spot for most North American climates. But that number shifts fast if they’re left in a damp truck or set directly on wet ground. Last year, a contractor in Seattle told me he’d ordered a pallet of our Western Red Cedar shingles, left them on the loading dock for three days in a rainstorm, and half the bundle swelled so bad they wouldn’t fit the roof’s spacing. To avoid that, uncrating and staging within 24 hours of delivery is non-negotiable.
When you uncrated, don’t just dump the bundles—lay them flat, out of direct sunlight and away from standing water. We supply shingles with rough sawn backs, so stacking them on pallets with 1×4 spacers between bundles is perfect. That small gap lets air circulate, preventing mildew on the bottom layers. I always remind customers: never stack more than four bundles high. Too heavy a stack can bend thinner shingles or cause the bottom layer to compress unevenly, which leads to cupping later.
Next, sorting your shingles. A lot of installers grab a random shingle from the top of the bundle and install it, which is a mistake. Wood shingles, even clear ones, have natural variations—some are thicker, some have more grain, some have small knots. Sorting by grade and thickness ensures a consistent look, which matters both for aesthetics and performance. Our shingles come in three grades: Premium (no knots, consistent thickness), Good (minor knots, same core thickness), and Utility (thinner, occasional knots for underlayer). When prepping, pull all Premium grade shingles first for the main roof surface—those need to be uniform to prevent uneven exposure that can lead to leaks. Then set aside the Good grade for secondary surfaces like gable ends, and Utility for the undercourse, which is covered by the upper layer anyway. I also like to sort by thickness: each bundle should have shingles within 1/8 inch of each other. If you mix a 5/8 inch shingle with a 3/4 inch one, the overlap will be uneven, and water can seep into the gaps.
Now, acclimation. This is where a lot of first-timers get frustrated, but it’s not optional. Your shingles need to match the moisture content of the job site. If you install a kiln-dried shingle in a humid climate, it will absorb moisture and expand, causing buckling. If you install a damp shingle in a dry area, it will shrink, leaving gaps between layers. How long does acclimation take? For most projects, 7-10 days. But here’s a pro tip I learned from a 20-year roofer in Maine: lay half the bundles flat on the roof deck, and the other half around the perimeter of the building. That way, the shingles on the deck get used to the exact temperature and humidity of the space where they’ll be installed, while the ones around the house acclimate to the air. Don’t stack them vertically—leaning bundles against a wall can cause the ends to warp. And never nail a shingle while it’s still acclimating; let it sit for the full time even if you’re in a hurry. Last spring, a customer in Portland skipped acclimation, installed immediately, and by summer, 12 shingles on the south-facing side had warped so much they needed replacement. That’s not a issue with the shingles—it’s a miss on prep.
Then, inspect for defects. Even with our strict quality control, a handful of shingles might have a small split or a knot that’s loose. When prepping, go through each bundle before laying: check for splits longer than 2 inches, knots that are protruding or have loose wood around them, and shingles that are cupped (curled along the edges instead of flat). Any shingle with a split that runs the length of the shingle is too weak for the main roof, so set it aside for scrap or use it for an underlayer. A small surface knot is fine, just make sure it’s not left loose. If you find a shingle that’s cupped, you can usually flatten it by laying it weighted under a couple of heavy bundles for 24 hours. Just don’t force it flat with a hammer— that can crack the wood further.
Now, prepping the job site for shingle installation—because even the shingles themselves matter, the surface they go on matters too. Wait, this is part of prepping the wood shingles? Kind of, because you can’t install shingles on a deck that’s wet or has loose nails. First, make sure the roof deck is dry. If you just re-decked after a tear-off, wait 24 hours for any residual moisture to evaporate. Then, install the underlayment properly—our shingles work best with a 30-pound felt underlayment or a synthetic underlayment rated for wood shingles. If the underlayment is wrinkled, smooth it out before laying shingles, because wrinkles can cause uneven spacing. Also, install the starter course first, which is a layer of shingles along the eaves. Prep those starter shingles by cutting 1 inch off the bottom edge to create a drip edge, which prevents water from getting under the shingles. That small cut is a quick step that adds years to the roof’s life.
Wait, what about cutting shingles during prep? Most installers cut shingles on the job, but when prepping, you can pre-cut any shingles that go around vents or chimneys. But don’t pre-cut too far in advance—cut edges can absorb moisture faster than whole shingles. I always tell customers: cut a shingle the day you’re going to install it, not a week before. When cutting, use a circular saw with a fine-tooth blade or a handsaw for clean cuts, splintered edges can be more prone to cracking.
Another step: marking exposure lines. This is part of prep because it ensures every shingle is laid with the right amount of exposure. For standard 18-inch shingles, exposure is usually 5 inches (meaning each shingle overlaps 13 inches of the one below it). Before laying, use a chalk line to mark horizontal lines every 5 inches along the eave. That way, you don’t have to measure every shingle, and every course is even. I’ve seen installers skip this step and end up with a roof that looks uneven, and more importantly, has gaps where water can get through.
Wait, what about if you’re installing shingles on a siding, not a roof? A lot of our customers use wood shingles for exterior walls too. The prep is similar, but there are a few differences. For siding, the moisture content should be a bit lower—10-12%, because walls are less exposed to direct water than roofs. Acclimation time is the same, but you need to leave a 1/8 inch gap between shingles to allow for expansion. For roofs, the gap is smaller, 1/16 inch, because the weather is more extreme. Also, for siding, you’ll want to install a water-resistant barrier behind the shingles, not just underlayment, to protect the wall from wind-driven rain.
Now, common mistakes to avoid when prepping. First, skipping acclimation—this is the number one cause of warping. Second, stacking shingles on wet ground or in direct sun for too long. Third, not sorting by thickness, leading to uneven exposure. Fourth, installing defective shingles, like ones with long splits, which can break under the weight of upper shingles. Fifth, not marking exposure lines, leading to uneven courses.
I remember one job where a contractor tried to rush, didn’t acclimate the shingles, and installed them in a week. By the end of the first summer, 20% of the shingles had cupped so badly they were standing away from the roof. He came back to us for more shingles, but we offered to supply them at half price because he’d followed our prep steps after that. That’s why we emphasize prep so much— it’s not just about selling shingles, it’s about making sure they perform.
At the end of the day, prep work takes 3-5 days, depending on the size of the job, but it saves you from costly repairs down the line. A properly prepped wood shingle roof or siding will last 20-30 years, whereas one with bad prep might need replacement in 10. That’s the difference between following the right steps and cutting corners.

If you’re planning a project and need help picking the right shingles, or want a detailed prep guide tailored to your climate, reach out to our team to discuss your needs. We’ve worked with contractors and homeowners for years, and we’re happy to walk you through every step, from delivery to installation, to make sure your project goes smoothly.
Carbonized Wood References
- Forest Products Laboratory. (2010). Wood Handbook: Wood as an Engineering Material. U.S. Department of Agriculture.
- Cedar Shingle & Handsplit Shake Bureau. (2018). Installation Guide for Wood Shingles and Shakes. Cedar Bureau.
- International Code Council. (2021). Residential Code for One- and Two-Family Dwellings. ICC.
- Roofing Contractors Association of America. (2019). Wood Roof Shingle Installation Best Practices. RCAA.
Dongguan Mumu WoodWork Co., Ltd.
As one of the most professional wood shingles manufacturers and suppliers in China, we also support customized service. Please feel free to wholesale bulk high quality wood shingles for sale here from our factory. Good service and low price are available.
Address: Room No.2602-2603, Unit 9B, Universal Commerce Center, Nancheng District, Dongguan City, Guangdong Province, China,523073
E-mail: sales@mumu-ing.com
WebSite: https://www.mumuthermowood.com/